Country (City)

Client

Description of Project 

Austria (LInz)

MWH

Pre-acquisition assessment of the operations, impact and management of an air compressor manufacturing facility

Belgium

Confidential

Pre-acquisition assessment of the operations, impact and management of a drainage equipment manufacturing facility

Denmark (Copenhagen)

US EPA

Study of the methods and practical success of the use of cathodic protection in UST design

France (Strasbourg)

General Motors

Assessment of environmental liabilities associated with the facility as defined by the US SEC rules

France (Sarreguemines)

General Motors

Assessment of environmental liabilities associated with the facility as defined by the US SEC rules

France (Donchery)

General Motors

Assessment of environmental liabilities associated with the facility as defined by the US SEC rules

France (Le Mans)

Lucent Technologies

Phase II assessment of an electronics factory operated by Philips prior to a joint venture

France (Nantes)

Metal Box

Pre-acquisition Phase I assessment of the operations and management of a packaging (tins) manufacturing company

Germany (Bielefeld)

EAC

Pre-acquisition Phase I assessment of the operations and management of a cash register manufacturing co. including two service centres in the UK and Holland

Germany (Kelheim)

Courtaulds

Pre-acquisition Phase I assessment of the operations and management of a company manufacturing acrylic fibres

Italy (Avezzano)

Texas Instruments

Provided technical support to TI in the proposed divestiture of the chip manufacturing facility E of Rome

Italy (Milan)

Xerox Corporation

Compliance audit of the operations and management system of a photocopier servicing facility

Italy (Brindisi)

Hexcel Corporation

Pre-acquisition Phase I assessment of the operations and management of a company manufacturing aircraft parts from carbon and glass-fibre composites

The Netherlands

James River Corp.

Pre-acquisition assessment of the operations, impact and management of a paper mill

Spain (Madrid)

Hewlett Packard

Assessment and pre-development Phase II site investigation of a proposed new manufacturing facility

Spain (Madrid)

Xerox Corporation

Compliance audit of the operations and management system of a photocopier servicing facility

Spain (Almaden)

Minas de Almaden

Evaluation of the risks associated with the operation of a mercury recovery facility from waste and the stockpiling of pre-treated waste & recommendations to reduce risks

Spain (Barcelona)

Courtaulds

Pre-acquisition Phase I assessment of the operations and management of a company manufacturing acrylic fibres

Holmes Environmental Limited - 18 Ravensbourne Gardens - Ealing - London - W13 8EW
Tel: +(00 44)(0)20 8810 9211 - Mobile: 07712 530 991 - E-mail: mail@holmesenvironmental.co.uk