Country

Client

Description of Project 

Jordan

MWH

Pre-acquisition Phase I assessment of an aircraft and aircraft engines engineering, repair and overhaul facility

India (Delhi)

General Motors

Pre-acquisition Phase I assessment of a 1960s-vintage ex-heavy cable manufacturing facility under consideration as an automotive products manufacturing facility

India (Delhi)

Rockwell International

Compliance assessment of the operations and management of an electronics manufacturing facility

China (Xiamen)

Rockwell International

Compliance assessment of the operations and management of an electronics manufacturing facility

Taiwan (Chu Pei)

General Electric

Pre-divestiture Phase I & II of a consumer electronics manufacturing plant

Taiwan (San Po Kong)

General Electric

Pre-divestiture Phase I & II of a consumer electronics manufacturing plant

Taiwan (Taipei)

Rockwell International

Compliance assessment of the operations and management of an electronics manufacturing facility

Hong Kong (Kung Tong)

General Electric

Pre-divestiture Phase I of a consumer electronics manufacturing plant

Hong Kong

General Electric

Pre-divestiture Phase I of a consumer electronics manufacturing plant

Singapore

General Electric

Pre-divestiture Phase I & II of a consumer electronics manufacturing plant

Singapore

Texas Instruments

Provided technical support to TI in the proposed divestiture of the chip manufacturing facility E of Rome

Malaysia (Muar)

General Electric

Pre-divestiture Phase I & II of a consumer electronics manufacturing plant

Malaysia (Kulim)

General Electric

Pre-divestiture Phase I of a consumer electronics manufacturing plant.

Japan (Osaka)

Rockwell International

Compliance assessment of the operations and management of an electronics manufacturing facility.

Japan (Tokyo)

Texas Instruments

Provided technical support to TI in the proposed divestiture of this chip manufacturing facility via local consultants.

South Korea (Seoul)

Rockwell International

Compliance assessment of the operations and management of an electronics manufacturing facility via local consultants.

Palestine National Authority 

Montgomery Watson

Preparation of a scoping study report as a first stage in the development of a Sustainable Management System for the Old Town of Bethlehem.

Jordan

Montgomery Watson

Preparation of a scoping study report as a first stage in the development of a Sustainable Management System and a Green Globe 21 Destination Award for the Baptism Site tourist and pilgrim destination at Bethany.

Turkey

Lucent Technologies

Pre-acquisition Phase I environmental assessment of an office complex in Ankara

Holmes Environmental Limited - 18 Ravensbourne Gardens - Ealing - London - W13 8EW
Tel: +(00 44)(0)20 8810 9211 - Mobile: 07712 530 991 - E-mail: mail@holmesenvironmental.co.uk